I’m excited to be working with Tom Richert to present a one-day Introduction to Lean Construction and the Last Planner System in DC. The event is on May 19 at the LCI headquarters and I’m sure it will be a blast. It’s always fun to meet new people and use simulations and real-life examples to help others re-imagine what’s possible. Details of the event are at this link: http://www.leanconstruction.org/calendar/35/478449-Introductions-to-Lean-Construction-the-Last-Planner-System-/